Manchester, NH
Taken over mid-job: siding, rot, porch roof & stairs
- The need
- A three-story multi-family left partway through by a previous contractor: siding stripped, rot exposed in the walls, the porch roof opened up, debris around the entries, and an unfinished opening in the stair hall.
- The work
- Cleaned up the site and fixed what had been left broken. Cut out rot and replaced sheathing, wrapped and re-sided the walls, reframed and closed in the porch roof, finished the entry deck and stairs with lattice skirting, and set a new stair-hall window with patched drywall and new trim.
- The result
- A fully sided, finished building with a sound porch roof and solid entry stairs.